top of page

Fabrication & Assembly

Our highly skilled and experienced fabricators and assembly team build your custom part feeding system with the utmost care and dedication to quality work.  

​

The build process starts with our long-tenured, skilled fabrication team cutting and welding the highest quality of steel available, right from a local steel provider in Grayling, Michigan.  The "tough built" steel components then go to the assembly team, for the cabinet, controls, wiring and tubing to be installed.    

​

Once the assembly team has done their job, your custom feeding equipment is off to the Test and Debug area for final inspection and a thorough run-off of the machine.

​

​

Dowels, head bolts, main bearing caps, cam caps, valve seals, head bolts, pipe plugs, valve retainers, valve guides

Air Way Automation, Inc.

Part of the Atlas Copco Group

2268 Industrial Drive

PO Box 563

Grayling, MI  49738-0563

OFFICE:  (989) 348-5176

FAX:  (989) 348-8967

bottom of page